We are delighted to inform you that the septic system repair and replacement have been finished. Grass installation is planned for next week.
We are extremely grateful for the patience and support from our community throughout this period. The past few months have been challenging, but now we can start enjoying our activities and events once more.
Completed
Project 2: New Epoxy Floor (already paid for itself as it is flood proof)
Project 3: Painted the interior of the building
Project 4: New Lower Hardwood Cabinets
Project 5: A mural on the East wall of Spoonbill room painted by Kellie Canterbury Simpson
Project 6: Failed all line items on Fire Inspections; fixed all issues and passed with flying colors.
Project 7: Discovered building Cornerstone and Honored it in the front of the building
Project 8: Installed bike racks and painted them coastal colors
Project 9: New Audio/Visual equipment including a 110-inch projection screen and Bluetooth speaker system
Tree Trimming on the front portion of the property (the large tree at the end of the building was in danger of crushing the west side of our facility)
Replaced all first aid equipment and expired items
Bingo machine repaired
New Updated website
Ongoing and Upcoming Projects
Install gutters on the building
Repair the garage door
Fix the stove, specifically the right oven
Install hurricane shutters for the windows
Attend to the park trees
Replace all tables and chairs
Replace storing containers for chairs and tables due to rust
New Signage
Moving the dumpster to a better location
Electrical to stage for future events and musical acts
Landscaping for saltwater flooding
Replace grass killed by Hurricane Milton
Shaded area where Lanai was destroyed by Hurricane Ian
How did we do in 2024?
Great job 100%
Needs improvement
I am still waiting on the Lanai replacement